Course
length: 3 days
| Discussion |
|
Equipment/ "Hands-On" Troubleshooting Labs |
| Introduction to the Eagle 3000 Stage
3 Control |
|
Eagle 3000 EO Gas Sterilizers
|
| Input
Devices |
|
Eagle 3017 100%
EO Gas Sterilizer |
| Output
Devices |
|
|
| Calibration |
|
|
| Eagle 3000 EO Gas Sterilizers |
|
|
| Eagle 3017 100%
EO Gas Sterilizers |
|
|
| Spare Parts |
|
|
Program
Synopsis
Principles of Operation: The student is presented with
an overview of the Eagle 3000 Stage 3 Control system.
Comparisons are made of the use and applications between
the two sterilizer models. Block diagrams and flowcharts
are used in this discussion, which also includes a
discussion of machine and control alarms.
Input/Output
devices: This section will deal with
the control structure, and the use and identity
of input and output devices. Troubleshooting techniques
will be included in this section.
Calibration: This discussion reviews the field calibration procedure
for the Eagle 3000 Stage 3 controls as applied to these
products. We will identify special tools and documentation
required. Variations for specific machine types are
discussed as well.
Eagle
3000 EO and 3017 100% EO machines: A
brief discussion of Tech data sheets will start
each session. The importance of dynamic utility
pressures will be highlighted. Classroom lecture
will include application of each machine type and
a discussion of the available cycles. The use of
documentation such as cyclegraphs, flowcharts,
piping schematics and electrical schematics will
be covered as well. Hands-on lab exercises will
be incorporated throughout the program.
Eagle
3000 EO and 3017 100% EO machines: The
program tree will be discussed. The programming
of cycles, and machine software setup will be covered
in both classroom lecture and with hands-on lab
exercises. The use of the control "Service Mode" will
be discussed and used throughout these sessions.
PMP/PMA: A
discussion of the TEAM approach to maximizing equipment
uptime is central to the discussions throughout the
course. Performance roles of the parties involved will
be identified, and procedures will be identified and
reviewed. A review of the spare parts package will
be included. |